HOUSING
- Die-casting of LNBF Housing and Scalar Ring, Housing is fromed from the die.
- Finish work ,Polishing, make the surface smooth using abrasive finishing machine
- Deburring , remove the burr, chip from the surface of LNBF and Scalar ring, this step is made by hand labor after polishing.?
- Drill &Threading , make a course in spiral for screws.
- Acid washing ,make the housing clean enough before coating.?
- Water rinse, move the residual acid from last step .
- Oven drying , dry the LNBF and Scalar ring after washing.
- Electrostatic coating, Powder coating, Workpieces are electrostatically coated with powder,using a spray gun to coated workpieces in the the powder room,then Heated in the oven ,to cause chemical reaction making the powder to cure, creating a highly durable finish.
PCB Assembly process
The PCB component mounting process has progressed from Pin-in-Hole or
Through-Hole-Technology (THT) to the faster and more flexible Surface Mount Technology (SMT).
- Program design- Mount PCB layout to the computer controll center.
- Paste print ,paste squeezed out to the surface of PCB.
- Place all the components onto the PCB. Computer-aided image evaluation helps the inspection.
- Reflow Soldering, In this Five zone convection reflow oven with five top and bottom heaters, Conveyor moves under the heat for a preset amount of time and then returns.This cause the solder joint reaction.
- Quality Control,Visual test on the component of every single solder joint.100%
ASSEMBLING AND TESTING
- Build in the polarization probe (linear & circular) into the feedhorn.
- Get the PCB and F connector fixed onto the LNBF.
?
- Welding Joint from F connetcor to the main board,welding linear and circular probe to the board.?
- Welding the crossover between probe and NE4210S01 Grid.
- Fix the ceramic dielectrics and adjust the probes.
- Get the shielding can fixed to the board.
- Adjusting of Local oscillator .First time.
- Do the measurement of Gain.First time.
- Measuring Noise .First time.
- Get the cover sealed with gasket and waterproof glue.
100%QC
- One by one ,Check the Specifications on the test instrumentation
- 100% Online Test, while connecting receiver and TV.
PACKING
- Labeling ,then put Screws bag ,Scalar ring together with LNBF into the gift box.
- 30 gift boxes into A main carton . Mark the C/N .
***********END************
Morgan Freeman
2008-3-8 International Women's Day ,
(8 March) is an occasion marked by women's groups around the world. Thanks ,Mam !